HomeHill Area Development Programme

HILL AREA DEVELOPMENT PROGRAMME

HADP is being implemented since 1975 onwards and It is implemented on water shed basis since 1984. Soil conservation, environmental protection, improving standard of life of farmers are the primary objectives of the HADP. In Horticulture sector, Plants and seeds, agricultural implements are distributed under 25 % subsidy to the farmers in priority and other watersheds. The following programme will be implemented during 2008-09.

 

S.No NAME OF THE WORK/MACROWATERSHEDS  

Target

I Assistance for Promotion of post harvest handling for packing materials at 25% subsidy for fruits, flowers and vegetables to small and marginal farmers in priority watershed area(atleast 20% for SC/ST farmers) Physical Target for 2008-2009 Financial Target for 2008-2009 (Rs in Lahks)
1 NADUVATTAM 1500 0.750
2 KOOKAL 1180 0.590
3 BOODIKARAIHALLA 1180 0.590
4 PATTICOMBAIHALLA 1140 0.570
5 DROOG PAKKASURANMALAI 1700 0.850
6 NORTH DEVALA 1700 0.850
7 ERUMAD 1300 0.650
8 AMBALAVAYAL 1500 0.750
9 COONOOR RIVER 1700 0.850
10 BEGAMBA HALLA 1500 0.750
11 HADATHORAI HALLA 1500 0.750
12 KUNDAH FOREBAY 1500 0.750
13 NEDUGULA 2100 1.050
14 CHERANGODE 1700 0.850
15 GUDALUR 1600 0.800
16 DEVARSHOLA 1200 0.600
17 OTHER WATERSHEDS 16000 8.000
Total 40000 20.000

S.No NAME OF THE WORK/MACROWATERSHEDS  

Target

II Distribution of 5 Hp /3.5 / 1.5 Hp Oil engine at 25% subsidy to Small and Marginal farmers in priority watershed area(atleast 20% for SC/ST farmers) Physical Target for 2008-2009 Financial Target for 2008-2009 (Rs in Lahks)
1 NADUVATTAM 4 0.200
2 KOOKAL 6 0.300
3 BOODIKARAIHALLA 2 0.100
4 PATTICOMBAIHALLA 2 0.100
5 DROOG PAKKASURANMALAI 2 0.100
6 NORTH DEVALA 2 0.100
7 ERUMAD 4 0.200
8 AMBALAVAYAL 3 0.150
9 COONOOR RIVER 2 0.100
10 BEGAMBA HALLA 5 0.250
11 HADATHORAI HALLA 3 0.150
12 KUNDAH FOREBAY 4 0.200
13 NEDUGULA 10 0.500
14 CHERANGODE 4 0.200
15 GUDALUR 4 0.200
16 DEVARSHOLA 3 0.150
17 OTHER WATERSHEDS 40 2.000
Total 100 5.000
S.No NAME OF THE WORK/MACROWATERSHEDS  

Target

IV Distribution of Agricultural Implements kits (containing Digging fork, Mammatty, Bill hook at 25% subsidy for BPL category (subsidy amount has been proposed) Physical Target for 2008-2009 Financial Target for 2008-2009 (Rs in Lahks)
1 NADUVATTAM 10 0.100
2 KOOKAL 110 1.100
3 BOODIKARAIHALLA 30 0.300
4 PATTICOMBAIHALLA 10 0.100
5 DROOG PAKKASURANMALAI 10 0.100
6 NORTH DEVALA 10 0.100
7 ERUMAD 80 0.800
8 AMBALAVAYAL 5 0.050
9 COONOOR RIVER 10 0.100
10 BEGAMBA HALLA 10 0.100
11 HADATHORAI HALLA 10 0.100
12 KUNDAH FOREBAY 5 0.050
13 NEDUGULA 15 0.150
14 CHERANGODE 20 0.200
15 GUDALUR 20 0.200
16 DEVARSHOLA 10 0.100
17 OTHER WATERSHEDS 2135 21.350
Total 2500 25.000
IV Production of economic plants and vegetable seeds in State Horticultural Farm. LS 5.000
V Production of avenue Tree plants of various species for supply LS 10.000
VI Production of Improved high yielding Tea clones LS 5.000
S.No NAME OF THE WORK/MACROWATERSHEDS Target
VII MAINTENACE OF HADP ASSETS Physical Target for 2008-2009 Financial Target for 2008-2009 (Rs in Lahks)
1 Maintenance of Nehru Park, Kotagiri LS 4.000
2 Maintanance of Arboretum at Udhagai LS 3.000
Total 7.000
S.No NAME OF THE WORK/MACROWATERSHEDS Target
VIII Construction of Drying Yard with Rain shelters Rs 5.000 lakhs/each Physical Target for 2008-2009 Financial Target for 2008-2009 (Rs in Lahks)
1 Cherancode Macro watershed 2 Nos 10.000
2 Gudalur Macro Watershed 2 Nos 10.000
3 Devarshola Macro watershed 2 Nos 10.000
Total 30.000
IX Construction of Thrashing floor at kallampalayam in Kotagiri Panchayat Union 1 No` 4.000
X Construction of seeds storage Godown with separations for storing gradeds seeds with drying yard at SHF, Colgrain 1 No` 18.000
XI Construction of seeds storage Godown with separations for storing graded seeds with drying g\yard at SHF Colgrain 1 No` 18.000
XII Formation of water storing pond in the existing swamp at SHF colgrain to promote irrigation facilities 1 No` 5.000
XIII Assistance for provision of Automated Post Harvest handling Unit for Washing/Sorting of fresh vegetables – Construction of water storage tank – drying yard etc., in Priority Watershed Area. 5 Nos 30.000
Grand Total 182.000